TBS Consulting helped to increase steel service center throughput by 1.5x at NLMK’s Steel Center in Manage, Belgium. The throughput increase resulted from using a simulation model to analyze facility layout and modifications. This case study details how the companies worked together on the solution.
TBS Consulting Ltd has been a partner of AnyLogic since 2013. As specialists in the FMCG, steel, oil, and gas industries, they provide related management, logistics, and IT consulting. TBS has delivered more than 100 projects and regularly uses simulation modeling in their solutions. MSC selected TBS to develop a specification and implement a model as part of their steel service center modernization project.
NLMK Manage Steel Center (MSC) provides a wide range of strip steel services in Europe. They focus on hot-rolled steels, pickled steels, cold-rolled steels, and galvanized steels for furniture, heavy & light metallic frames, and the automotive industries. Most of the steel is supplied by road with just-in-time deliveries. The center processes over 200,000 tons per year.
Problem
MSC planned to implement a set of modernization activities to increase throughput at their facility by 1.5x. Changing the layout of the facility could increase throughput, and engineers identified several considerations for analysis:
- The installation or relocation of production lines
- Crane additions
- Scale locations
- Conveyor installations
- The opening of additional gates
Many interrelated factors might affect throughput performance, but any reconfiguration should fit the facility’s constraints and provide the desired throughput.
The facility’s territory is limited by a railway, a canal, and private property, leaving little space to fit a new production line. Limited space is also a problem for trucks arriving for finished goods, which must take special precautions to avoid collisions.
The loading of coils onto the production line requires one of two existing powerful cranes. And, in the place where these cranes move, space is required for the unloading of the finished steel coils from the line.
An additional production line would take a lot of extra space in the facility and would decrease storage capacity for finished goods before the shipment. As a result, there could be an impact on export activities.
Any solution should also consider seasonal variations in client demand and the supply of coils, as well as high levels of variability in daily truck arrivals.
Solution
In the first phase of the project, TBS and MSC agreed on a detailed technical specification for a model that covered the whole production cycle. Activities captured by the model ranged from the arrival of coils at the facility, through production and storage, to the shipping of finished products. The model would provide an overall site view, as well as detailed operational data, such as for operators, cranes, and production lines.
The technical specification was very important because it formed the foundation of the project development, determining the inputs, outputs, and statistical distributions for use in the model, as well as the agreed user requirements.
Following the specification, the project went through three further stages of development:
- Construction of an as-is model, representing the facility as it was
- Experiments and analysis of plans
- Delivery of a tool for scenario analysis and day-to-day planning
The as-is model represented the facility as it was, and its accuracy was verified by running simulations with historical data. The model could then be used to test various scenarios and compare their results. Finally, by implementing easy user input, the tool could be used for planning, such as for organizing day-to-day operations or analyzing year-long scheduling.
The simulation model supported analysis and helped build insight by allowing various experiment types. For example, the 2D and 3D visualizations let engineers verify that the model was accounting for considerations that may have not been captured in the model logic.
In the case of crane control, the standard overhead crane included in Material Handling Library does not account for operator movement – an operator controls an overhead crane from a mobile remote control. AnyLogic’s customizability meant the designers could easily specify that a crane’s operator must follow certain paths to comply with safety regulations, while the crane load would move according to its own operational path.
Accounting for differences in the crane operator and crane paths gave time constraint information critical in helping identify bottlenecks.
Experiments without visualization, however, permitted faster experiments, such as mass runs using parameter variation.
Overall, the model collected detailed data on each operation, such as coil or sheet movements, truck arrival and departure, coil processing, and operator actions.
Performance indicators included data for total weight produced, total weight shipped, resource utilization, and more. All the information from simulation runs could also be exported for further analysis in Excel.
TBS implemented the model for MSC using AnyLogic simulation software. Simulation modeling provides an important method of analysis that is easily verified, communicated, and understood. It gives all stakeholders in a project clear insights into complex systems.
Results
The model helps to identify most critical resources and affiliated risks and can check the effectiveness of decisions (e.g. different placement policy or adding a new crane). Also, it enables finding bottlenecks for truck operations.
Simulation modeling helped the MSC management team to select optimal configurations for the facility and confirm their productivity. Their analysis showed that the installation of the new CTL production line will significantly improve the ecological factors in line with NLMK’s general strategy.
Analysis of crane and gate efficiency showed that one crane was causing a bottleneck, with an average utilization of over 70%, and periods when trucks were left waiting.
Accounting for differences in the crane operator and crane paths gave time constraint information critical in helping identify bottlenecks.
Due to seasonal variations, steel service center bottlenecks were shown to cause a small percentage of incoming trucks to wait so long that they would miss their next scheduled appointment. Although only a small number, these delays would have knock-on effects that could cause further disruption.
After the initial results, management is now looking to use the model for daily operations planning, as well as optimizing arrival plans and coil storage to decrease the number of extra reshuffling operations.
In the future, the intention is to fine-tune the storage policies, work schedules, and equipment selection. And finally, the model is available for experiments and analysis in the case of extreme conditions.