Problem:

HAVI is a $5 billion global company and McDonald’s long-time supply chain and packaging partner. They provide services for supply chain management, packaging, logistics, recycling and waste. When McDonald’s wanted to build on the success of the All-Day Breakfast launch by expanding all-day availability to more menu items at 14,000 restaurants, they encountered a number of challenges (menu complexity, new equipment needs, space constraints).

All Day Breakfast Expansion

McDonald’s business objective was to equip and staff its kitchens to obtain the best financial yield possible for the menu expansion. Working with HAVI, a simulation model was created that reflected the enormous complexity of the supply chain and operations across the 14,000 restaurants. The value of the model was to enable more informed decision making for equipment purchases and staffing.

Solution:

HAVI employs an iterative hypothesis-driven process for its simulation and analytics, balancing data with human experience.

Hypothesis-driven process

To meet McDonald’s requirements, the model considered:

Using AnyLogic, these requirements could be met and simulated, along with the spatial constraints and the wide variety of equipment and labor configurations. Decision variables of the simulation model included:

Layout of a modeling kitched

On the output side, it was vital to measure the customer experience. As a result, factors such as service time, product freshness, and waste, among other service metrics, were also included in the model.

Finally, according to the rigor of HAVI’s analytics process, the model was subject to validation and calibration, including trials in McDonald’s test kitchen. The resulting model captured the necessary metrics and provided simulation comparable to the real world. In short, the AnyLogic simulation assisted in the decision-making process, providing McDonald’s with the best financial yield for the desired menu expansion.

The power of agent-based modeling in AnyLogic allowed the nature of the system to be captured as it is in the real world. The characteristics and parameters of equipment, labor, and the environment they operate in, can be modeled as necessary and custom objects developed for re-use.

HAVI chose to use AnyLogic simulation due to its support for multiple modeling methods, with agent-based, discrete event, and system dynamics working together inside one system for the most holistic and powerful results.

Outcome:

The AnyLogic model delivered results for a variety of demand profiles and restaurant configurations. This enabled HAVI to provide tailored recommendations.

These recommendations covered equipment needs and cost estimates for meeting customer service level thresholds in various scenarios. The benefits of which produced proposed equipment cost avoidance and optimized cost tradeoffs for labor and equipment.

Without AnyLogic simulation modeling, time and cost constraints associated with exhaustive physical tests would have prevented tailored recommendations.

Project presentation by Nate DeJong, HAVI

Screenshot_1.jpg

Similar case studies

  • Improving Plane Maintenance Process with AnyLogic Simulation Software

    The military aircraft maintenance turnaround process (the in-between time when the aircraft touches down, is refueled, rearmed, and inspected, in order to be released) is complex and, being fairly time-consuming, includes multiple interactions and parallel workflows. Engineers from Lockheed Martin, one of the largest companies in the aerospace, defense, security, and technologies industry, used AnyLogic simulation modeling to improve decision making in the entire military airplane turnaround process and evaluate the impact of process changes on turnaround time.
    Read more
  • Construction Simulation Model Tackling Increased Constraints on a Complex Earthmoving Project

    Consolidated Contractors Company (CCC) is the largest construction company in the Middle East and ranks #18 internationally. CCC has offices and projects in over 40 countries, and a workforce of more than 130,000 employees. Just after contract signature of a site preparation project (earthmoving scope of approximately four million cubic meters), the client and local authorities placed new, more restrictive constraints on the operation. The newly placed constraints essentially meant that the project schedule will be severely impacted and with it the total cost to complete.
    Read more
  • Call Center Optimization and Investment Planning Using Simulation Modeling

    The world’s largest companies use data analytics to increase their revenue and keep up with the changing business world. But how does data science relate to simulation modeling, and what are the cases for the implementation of this interaction, primarily concerning value for the business? The United Services Automobile Association (USAA), a Fortune 500 group of companies, has answered these questions with real-life solutions.
    Read more
  • Modeling of Banca d'Italia Back Office System

    Banca d'Italia processes a certain amount of manual credit transfers every year. These transfers cannot be processed automatically and require two divisions of employees in the back office of the bank. The bank wanted to determine if merging these two divisions would be beneficial.
    Read more
  • Improving Patient Flow at an Outpatient Clinic Using Discrete Event Simulation Modeling

    Indiana University Health Arnett Hospital, consisting of a full-service acute care hospital and a multispecialty clinic, faced poor statistics because the number of no-show patients (those who don’t show up for their scheduled appointments) rose dramatically to 30%. This was primarily connected to the fact that clinic schedules were driven by individual preferences of the medical staff, which led to increased variations in scheduling rules. To eliminate the problem, the client wanted to develop a scheduling methodology that would benefit the clinic, doctors, and patients.
    Read more
  • ATOM: Digital Twin of Siemens Gas Turbine Fleet Operations

    The Agent-based Turbine Operations & Maintenance (ATOM) model is a digital twin simulation model developed by decisionLab Ltd and Siemens. The digital twin emulates the global maintenance repair and overhaul (MRO) operations of Siemens’ aero-derivative gas turbine division. Driven by live data already available within the supply chain, the model provides the capability to use sophisticated simulation and data-analytics methodologies to optimize the fleet operations of Siemens, enabling better data-driven decision-making to improve productivity and efficiency in customer operations and asset management.
    Read more
  • Automotive Company Applies Business Process Simulation Tool to Improve Resilience and Innovation

    A multinational US based automaker was considering altering the company’s strategy and business model in the face of changing realities. A resilience and innovation gap can grow into an existential risk. Statistics show that companies are six times more likely to go bankrupt today than 40 years ago. Today, the car ownership model is gradually being replaced by a model where a vehicle is a service. In view of this, the automotive company declared itself not a manufacturer any more, but a mobility company.
    Read more
  • Analysis of Management Strategies for the Aircraft Production Ramp-up

    The Airbus Group joined the European Union ARUM (Adaptive Production Management) project, which is focused on creating an IT solution for risk reduction, decision-making, and planning during new product ramp-ups. The project is aimed mainly at aircraft and shipbuilding industries. Simulation was chosen as a part of the ARUM solution, because it would allow the participants to reproduce the real production facility experience.
    Read more
More case studies