Production plans are based on fair assumptions of process performance and all operation parameters are taken as averages. There are a number of events that happen in any manufacturing setup during the course of production like periodic delivery of raw materials or changeovers on a machine. The interaction between these events is non-linear and cannot be easily visualized. As a result of which most of the production plans in any company have only a limited realization. This paper provides an example of how simulation using AnyLogic has been applied in one such plant scenario to visualize the plan outcome.